Getting My Geyser Installation To Work

Wiki Article

The Ultimate Guide To Geyser Installation

Table of ContentsThe Main Principles Of Geyser Installation Everything about Geyser InstallationThe Facts About Geyser Installation UncoveredThe 10-Second Trick For Geyser Installation
In this article I will define the common standard needs of an audio, contemporary high stress, straight setup. The adhering to summary relates to a modern-day high stress (400/600Kpa) system commonly made by Kwikot South Africa.

geyser installationgeyser installation


Less common are old low stress systems (100kpa) open pipeline or "Latco" type systems. Know that the components are NOT compatible between the 2 distinctive systems - High stress and Reduced pressure! It is possible to eliminate an old low pressure system as well as replace it with a modern-day high pressure system nevertheless - you buy a new high stress geyser as well as install it according to the current requirements.



The hot spring sits in a tray made of plastic (commonly red) or tin plate. I favor the plastic ones.

Since June 2001, the drip tray is not optional - its obtained to be there and there has to be a drainpipe pipe for it! The drainpipe is a 50mm PVC waste pipe that drains pipes the tray by piping the water out the home (geyser installation).

The 30-Second Trick For Geyser Installation

The next most obvious function would be the. These are tiny brass elements installed at the end of a 30cm length of pipe. The two vacuum breakers stand vertically concerning 30cm above the geyser. These are very important, as they stop water siphoning out the geyser when the cool supply is quit.

Remember that vacuum breakers are a reasonably new need - there are still thousands of old HP systems out there without vacuum cleaner breakers as well as I am yet to see one collapse. Simply because I have not seen it does not suggest it's not taking place!

The cold water side is the side that directly attaches to the drain penis and also enters the geyser near the bottom. After the shut down valve you would typically discover a Pressure Control Valve (PCV). There are a number of various types, mainly made from brass but some are made of plastic.

This is where the PCV launches pressure and this is the pipeline that typically leaks. Don't panic if you can not find the PCV following to the geyser - it may be totaled 10 metres away, typically in a more accessible position on a wall surface outside. In some cases it's in a little plastic box outside.

Not known Facts About Geyser Installation

This is a vital part that ought to never be messed with or 'repaired'. This shutoff needs to have a metal (copper or steel) pipe attached to it and the pipe need to lead directly out the structure. This air vent pipeline is an essential safety attribute of the entire system. It has to be constructed from copper or steel - plastic.

The T&P shutoff is the least optional component - it has to exist! - The weight of the hot spring need to be sufficiently supported on the roof covering trusses - a minimum of 2 assistances under the 'feet' of the geyser. If it looks shaky obtain a plumbing professional to inspect it out.

This was not a need on old geysers, however it is currently as well as it deserves fitting one. The hot spring needs to be earthed! I have actually seen many hot springs with the earth wire inapplicable. All the copper pipes should likewise be earthed as well as adhered to the geyser earth. This is not an unimportant precaution! Obtain a qualified electrical expert to inspect your installment if the bonding is missing or looks dodgy.


Once again, these are usually just left lying next to the hot spring. There are essentially only 2 main thermostat kinds - the modern round "Kwiktherm" in more recent Kwikot hot springs and also the VK (rectangle-shaped block) kind in older geysers and also in some newer non-Kwikot units. The geyser might be fed (cold water) with polcop (plastic) pipe - approximately the turned off shutoff, but the pipe into and out of the hot spring should be copper or galvanized steel.

Getting The Geyser Installation To Work

geyser installationgeyser installation


The warm water side ought to be copper, steel or suitably ranked (70) plastic or composite pipe. Keep in mind that you should contend least check 1m of copper/steel pipe out the geyser - you might not connect plastic (compound) pipeline straight to the geyser. As above, the PCV and T&P you could try here must be useful reference made from copper or steel - particularly the air vent out of the T&P shutoff.

geyser installationgeyser installation


I have seen a number of setups where the installer has just run a brief size of 22mm copper right into the drip tray with the concept being that the T&P can air vent straight right into the drip tray. A concept due to the fact that the warm (100 +) water/steam thaws the drip tray as well as the PVC drainpipe pipe.

The PCV is usually over the geyser as well as the chilly water flows down into the geyser. This is rather important since it creates an anti-syphon loophole that stops the geyser from draining back via the inlet in the occasion of a water system failure. If you fume water coming out your chilly faucets when the water system fails after that this is not working appropriately.